PEKERJAAN BALOK SLOOF
         
BETON STRUKTUR 1. BETON STRUKTUR
a         : m
a. VOLUME =      ( a x t ) x P. seluruhnya
b         
: m    
=       (  m x  m  ) x m                
P.S
: m
 
     
=        m2 x m     
Beton  
:
   
=         m3                     
SB       
:
     
         
BESI TULANGAN UTAMA
 
b. BAHAN
a. Semen Portland 40 Kg=  Zak
D      
: m
   
b. Pasir Beton = m3
Jml    
: Bh
   
c. Batu Pecah/split 2/3 = m3
         
BESI BEGEL/SENGKANG
2.
BESI UTAMA
 
D     
:
 
a. Panjang
= Panjang Sloof x Jumlah Besi
JB     
:
   
= m x bh
       
= m
 
     
 
b. Berat Besi
= D2 x 0,006165 x Panjang besi
       
= 2 x 0,006165 x m
P.S
: Panjang Sloof
   
= Kg
S.B
: Selimut Beton
     
     
c. Jumlah batang
= Panjang Besi : Panjang perbatang
a
   
= m : 12
 
            
= Btg besi Ø
     
 
d. Kawat Beton
= Kg
     
3
BESI SENGKANG
 
a. Panjang Begel
=((Tinggi - SB) x 2) + ((Lebar - SB) x 2) + (5.D) x 2
     
Diameter
=(( - ) x 2) + (( - ) x 2 ) + (5 x ) x 2
     
= ( x 2 ) + ( x 2 ) + ( x 2)
     
= + +
     
= cm
         
     
b. Jumlah Begel
= Panjang Sloof + 1
     
Diameter
      Jarak Begel
       
=     m + 1
       
         m
       
=       Bh
     
     
c. Total panjang
= Jumlah Begel x Panjang Begel
     
Begel
= x cm
       
= m
         
     
d. Jumlah batang
= Total panjang begel : 12
       
= m : 12 m
       
= Btg
         
     
e. Berat besi
= D2 x 0,006165 x Panjang besi
       
= 2 x 0,006165 x m
       
= Kg
         
       
  4
BEKISTING
a. Papan kelas III = m3
     
b. Paku biasa 2"-5" = Kg
       
c. Minyak bekisting = Liter